Stages & Activities
Activities assumed by each partner are listed in the tables below (left)-INFLPR and (right)-IFIN-HH and divided into four stages:
- Stage I (3.07.2024- 31.12.2024): Configurations and preliminary experiments
A1.1: Development of free-standing solid targets – preliminary experiments. |
A1.3: Design and manufacturing of honeycomb scaffold |
A1.2: Results exploitation |
- Stage II (01.01.2025-31.12.2025): ELITE work-flow optimization and advanced characterization
A2.1: Deposition, optimization and investigation of Free-Standing targets based on C, B and Ppy |
A2.3: Development of the Target Alignment System and refinement of scaffold design |
A2.2: Results exploitation |
A 2.4: Dissemination |
- Stage III (01.01.2026-31.12.2026): Manufacturing and advanced testing
A3.1: Manufacturing and comprehensive characterization of high repetition rate targets |
A3.3: Optimization and tests of high repetition rate free-standing targets in ELI-NP relevant environments |
A3.2: Results exploitation |
A3.4: Dissemination |
- Stage IV (01.01.2027-31.03.2027): Validation of ELITE outcomes and perspectives in the framework of ELI-NP
A4.1: Compilation of findings and project outcomes on target manufacturing |
A4.3: Validation of ELITE targets and alignment system in the framework of ELI-NP |
A4.2: Results exploitation |